Dry Pully Bully


Step 5 Dry Pully Bully Dry Pully Bully #2

Download Available Information
Click on Image or Title below
Dry Pully Bully Order Form
Dry Pully Bully Drawing

Dry Pully Bully

MEI’s NEW Dry Pully Bully makes changing a dry motor an easy proposition. The Dry Pully Bully is a safer, more streamlined method that will save you time and stress on your next service call.


  • Safe Operation
  • Reduced Labor Hours
  • Light Weight
  • Quick & Easy Setup


  • Lifting Capacity: 750 lbs.

How it Works

Roll the Dry Pully Bully into the machine room. Attach the winch hook on the top edge of the tank wall and winch the frame into position (see photos). Set up the hoisting frame legs for the ideal lifting position. Use the winch to lift motor and trolley out onto the machine room floor.






19336 607th Avenue
Mankato, MN 56001

  • Manufacturing Plant
  • Field Ops

Field Offices

MEI-Badger Elevator
MEI-Duluth Office
MEI-Kansas City Office
MEI-Northeast Office
MEI-St. Paul Office
MEI-Michigan Elevator
MEI-Springfield, MO
MEI-Wichita, KS
MEI-Colorado Office

Follow MEI

Headquarters and Field Offices